§ 123-5. Connection to public system required.  


Latest version.
  • Except as provided in § 123-7 hereof, in the event that any parcel is being serviced by a well for domestic use and/or an agricultural use as of the date of the enactment of this chapter, within 30 days after the effective date of this chapter, the owner of said parcel shall be required to take those steps necessary to connect to a public water system to obtain water for domestic use and/or agricultural use. The cost of constructing a main from the structure to be serviced to the boundary of the parcel and connecting to a public water system shall be borne by the owner. The use of any existing well for domestic use and agricultural use is expressly prohibited.